50 years of finishing and maintaining buildings. We provide a full range of services including general decoration works, wall coverings, spray applied finishes, anti-graffiti systems, intumescent coatings, specialist finishes and effects and industrial flooring coatings. Please take a look at the variety of projects we have completed.
Client: BAM Construction
Completion: Phase 1 completed 2024, Phase 2 coming Spring 2025
King Edward VI Handsworth Wood Girls Academy is undergoing a major three-phrase reconstruction to provide brand new teaching facilities to its pupils.
The original 1960s building was not sufficient for the school to deliver the curriculum, due to inefficient spatial configurations and poor movement between blocks. Aside from the more recent sixth form centre, all existing teaching accommodation was demolished to make way for the main L-shaped 3-storey teaching block, including classrooms, dining and main halls and a drama studio.
During the first phase of the project, we have carried out decoration works across the brand new classrooms and communal spaces using Johnstones Paints, as well as applied epoxy resin to plant rooms. The second phase is underway and expected to be complete by Spring 2025.
King Edward VI Girls Academy
Birmingham
£259k
Client: Oxford University
Decoration Dates: December 2013
A challenging top-down construction carried out by Laing O'Rourke, the 24,400 sqm building is a world-class facility designed to foster mathematical research.
FH Harvey carried out full decoration works throughout, including the bright and spacious atrium, faculty research areas, lecture halls and seminar rooms. The project had exacting sustainability and quality standards, with strict timescales and budget, but our team were certainly up to the task. The buildling blends perfectly with the Oxford's distinct historical architecture and now provides a work space for over 500 mathematical academics, researchers and staff.
Oxford University Maths Institute
Oxford
Client: KIER
Completed: 2024
As part of Cambridgeshire County Council's goal to accommodate Cambourne's community growth, the Cambourne Village College now has a new independent sixth form building with 300 new student places. Our team carried out all decoration works on the project, including painting walls, ceilings and trims throughout.
Cambourne College
Cambourne, Cambridgeshire
Client: Laing O'Rourke
Expected completion: Autumn 2025
This prestigious new building is a result of the single biggest donation in the University's history, a total of £185 million from philanthropist and businessman Stephen A. Schwarzman.
Oxford Vice-Chancellor Professor Irene Tracey shared her thoughts: "The Schwarzman Centre has enormous potential both to benefit teaching and research in the humanities, and to be a place which makes a genuine contribution to the local community in Oxford as well as the national and global cultural sector."
Led by Laing O'Rourke, the new building will bring nine faculties and institutes and seven libraries and collections into one home. The project also includes a 500-seat concert hall designed with world-leading acoustic capability, a 250-seat theatre and a film screening area. The project is schduled to complete in Autumn 2025, welcoming students in the new academic year.
Schwarzman Centre of Humanities
University of Oxford
We are pleased to have partnered wwith Willmott Dixon on the new development at Myton School, Warwick.
Our team conducted full decoration throughout all classrooms, offices and communal spaces. We used Johnstone's products for all paint work, including Durable and Clean Matt for all walls, ceilings and trims, and a specialist Anti Slip Flortred Floor Paint on all concrete floors, ideal for the school environment.
Myton School
Warwick
Client: Kier
Completion: September 2017
FH Harvey secured the decoration package with Kier for this £26 million build. Alperton Community School is based in Wembley and caters for over 1,700 pupils. FH Harvey carried out all decoration works on this project, including both newly built and refurbished areas.
Alperton Community School
Wembley, London
Client: Kier
Completion: August 2016
Maiden Erlegh School was awarded to us by Kier Construction. The £11 million school offers state of the art facilities for 900 students, with the project achieving 'Very Good' BREEAM rating. FH Harvey's work involved full painting and decoration works across the 6200 sq m building, spanning three floors, including a central assembly hall and open dining area.
Maiden Erlegh School
Reading
Client: Kier
Completion: 2021
We were delighted to work with KIER Construction on the delivery of Harris Clapham Sixth Form Academy.
Part of the Harris Federation, work consisted of the demolition of an existing 1930s former army reserve centre and the construction of a new four-storey building. The 5,250m² building accommodates 600 pupils, with a range of state-of-the-art facilities, including a drama studio, science labs, ICT classrooms, an art studio and a gym/fitness suite.
Harvey carried out all decoration works throughout, including finishes to walls, ceilings, doors and all external areas.
Harris Clapham Sixth Form
Clapham, London
Client: EQUANS
Completed: September 2023
We were pleased to work with EQUANS at Kingston University London, preparing the halls of residence for the arrival of students for the new academic year.
Our team carried out full decoration works across 300 student rooms, including walls, ceiling and woodwork.
Kingston University